The Pulse
  • About The Pulse
    • Meet the Staff
    • Advertising
    • Join The Team
      • Get Involved
    • Contact Us
  • Pulse Radio
    • Radio Underwriting
    • Podcasts
  • The Clarion
  • The Swinging Bridge
    • The Swinging Bridge Magazine
    • The Swinging Bridge Online
      • News
      • Culture
      • Sports & Rec
      • Student Life
      • Opinions
Select Page
As Construction Starts, Trees Come Down, Sustainability is Considered

As Construction Starts, Trees Come Down, Sustainability is Considered

by The Pulse | Aug 7, 2019 | News

By Maddie Conley-Online Editor The center of campus will look a lot different when students return later this month. With the new Kim Phipps Admissions and Welcome Center construction underway, campus will begin seeing changes in parking, pedestrian walkways and green...

FCC Public File

Open Hours

Monday – Friday | 1pm – 5pm

We are located in the Downstairs South Wing of the Larsen Student Union.

Search Our Site!